|
|
 |
Oaonui gas production station for Shell BP Todd Oil
Services
Titan supplied all cranes and associated personnel for
construction of the plant. |
 |
 |
Petralgas methanol plant at Waitara Valley
Titan was a joint venture partner with Sparrow Crane
Hire (UK) to supply 300 tonne crane and all rough
terrain cranes for construction of new plant. |
 |
 |
Motunui gas to gasoline plant for Bechtel Ltd
(USA)
Titan was a joint venture partner to supply over 100
items of equipment, including 53 cranes, for the
construction of the plant. This was the largest
project of its type in the world at the time. |
 |
 |
Methanex NZ Ltd maintenance crane requirements
Titan continue to supply all cranes and riggers for
maintenance work at Methanex Motunui and Waitara
Valley plants. |
 |
 |
Shell Todd Oil Services maintenance crane
requirements
Titan continue to supply all cranes for maintenance
and capital work at all STOS Taranaki sites. |
 |
 |
Wind turbine erection for Enercon (Germany)
Titan assisted in the erection of wind turbines at New
Zealand's first wind farm at Martinborough-owned by
Wairarapa Electricity. |
 |
 |
Kupe Production Station South Taranaki for Origin Energy Resources (Kupe) Ltd Supplied Cranes, lift plans and lift supervision for the construction of the Kupe Production Station. Titan continues to supply cranes and lifting services on all Origin Energy Resources (Kupe) Ltd Taranaki Sites. |